source: time:2019-04-15
2001
-Taishi Guangzhou Waterproof Material Production Base has been completed and put into operation. Won the bid of Guangzhou Metro Line 2 waterproof material.
2002
-Won the bid of Guangzhou Metro Line 3 waterproof material . Won the bid construction of the longest Dayaoshan tunnel of Wu-Guang Railway waterproof and leak stoppage project.
2003
-Won the bid construction of Hengda Real Estate Waterproof Material.
2004
-Won the bid construction of Guangzhou New Baiyun Airport.
2005
-Won the bid of Guangzhou Metro Line 4 and 5 waterproof material. Won the bid construction of the floor project of Guangzhou International Convention and Exhibition Center.