logo.jpg
EN 中(zhōng)文

24 hours Hotline

400-6352-668

TS-202 Environmental protection one-component polyurethane

TS-202 Environmental protection one-component polyurethane waterproof coating is  made of isocyanate and polyether polyol as the main raw materials and various additives. After coating, the film can be cured with moisture in air and base as crosslinking agent.

 

Order Hotline:400-6352-668

Product characteristics 

Green environmental protection, ready-to-use barrel opening, simple construction;

The product has stable performance, aging resistance, high and low temperature resistance and ultraviolet resistance.

Suitable for construction on complex foundation, strong bonding force, forming a whole seamless waterproof adhesive film.

 

Scope of application 

Basement waterproofing, subway, tunnel, pipe gallery, pit, pool, gutter, toilet and bathroom waterproofing;

Waterproofing of expansion joint, construction joint, deformation joint, etc.

Waterproof of flat roof, slope roof and planting roof of concrete structure.

 

Usage method 

1. The base surface should be clean and dry, and cracks should be repaired and smoothed first.

2. Rubber scraper should be used to scrape, and the thickness of the coating should be uniform , and there should be no leakage, separation and other phenomena.

3. Waterproofing works need to be scraped 2-3 ways, with a total thickness of 1.0-2 mm. After the previous coatings are dry, the next construction can be carried out.

4. The construction temperature ranges from 5 to 35. Avoid rain before the film is dry.

 

Performance parameter 

Reference Dosage:1.5-2.5kgs/

Initial setting time: ≤12hours

Final setting time: ≤24hours

Construction temperature: +5℃~+35℃

Packaging: 5kgs/bucket, 16kgs/bucket

Implementation standard: GB/T 19250-2013, specific indicators see technical parameters.

No

Project

Technical   standard(II)

I

II

1

Tensile strength/Mpa    ≥

2

6

2

Tear strength/N/mm    ≥

15

30

3

Fracture elongation /%       ≥

500

450

4

Water   impermeability

0.3Mpa,   120min Impervious

5

Low   temperature flexibility

-35   no crack

6

Initial   setting time /h   ≤

12

7

Final   setting time/h    ≤

24

8

Solid   content /%      ≥

85

 

Transportation & storage

Storage in dry room, away from fire and heat sources, storage temperature should not be higher than 35 C.

Prevent collision and sunshine and rain during transportation.

Under normal storage and transportation conditions, the storage period is 12 months from the date of production.

 

Attention 

After opening, it will be used up in half an hour. When the product is stored for a long time, a thin film may be formed on the surface of the coating, which can be removed without affecting the use effect.

It is strictly forbidden to walk on the waterproof layer before the coating is solidified. It is forbidden to damage the waterproof layer by heavy and sharp objects.

Ventilation should be maintained at the construction site. Safety caps, gloves, work shoes and other protective equipment should be provided to avoid irritation to skin and eyes. Fire sources should not be touched at the construction site.

TS-202 環保單組份聚氨酯 16kg-桶.jpg

法律聲明

法律聲明法律聲明法律聲明法律聲明法律聲明法律聲明法律聲明
x

隐私保護

隐私保護隐私保護隐私保護隐私保護隐私保護隐私保護隐私保護
x
x