logo.jpg
EN 中(zhōng)文

24 hours Hotline

400-6352-668

TSD501 Color Green-way Anti-skid Floor Coating

The color green-way anti-skid floor is an ideal material for anti-skid coating on traffic surface. The material is made of natural color anti-skid aggregate, which is calcined by special pottery calcination process (Ps_70*), providing us with a solid and durable color ground system. The color green-way anti-skid floor can be used on the surface of asphalt, concrete and gravel. It has good wear resistance and adhesion. It can also strengthen the strength of the base plate, and has the characteristics of oil resistance and corrosion resistance.

Order Hotline:400-6352-668

Application Range

Highway, green-way, sidewalk tunnel, outdoor square, outdoor parking lot and other places.

 

Product performance

Anti-skid: It has good anti-skid performance and can reduce the braking distance by 35%.

Weather resistance; is currently the best outdoor weatherproof color sand anti-skid adhesives, not affected by light and rain, non-fading, anti-aging

Decorative: Use special pottery clay coloured sand, with various colours and strong decorative.

Environmental Flame Retardant: Solvent-free, non-flammable, non-toxic, safe and environmentally friendly.

Self-cleaning: It has good dust-proof performance, and can be refreshed by washing after rain.

High efficiency and practicability: rapid solidification, normal temperature, five hours after completion of access, economical, simple and rapid construction.

Adhesion: It can be constructed on compact asphalt, cement, concrete and other floors. It can also be adapted to various organic and inorganic gold buckling surfaces with strong adhesion.

Cracking resistance: with excellent extensibility, not easy to crack and easy to maintain; maintenance at any time, simple and convenient operation, short construction and maintenance time, low maintenance costs.

 

Technical standard

Inspection items

Index value

State in Container

After mixing, there is no hard block,in a uniform   state

Drying time(H25)

Surface dry

≤4

Actual dry

≤24

Adhesion/class

≥1

Impact resistance,Ø50mm, 500g steel ball, height   100m

No cracks, peeling off of the coating

Wear resistance(750g/500r)/g

≤0.030

Tensile bond strength 7d standard condition/M Pa

≥2.0

Water resistance(168h)

No blistering, no peeling, allowed slight   discoloration,restored after 2h.

 

Chemical resistance

15% NaOH solution 72h

No blistering, no peeling, allowed slight   discoloration,

10% HCL solution 72h

No blistering, no peeling, allowed slight   discoloration,

120% #Solvent gasoline 72h

No blistering, no peeling, allowed slight   discoloration,






System characteristic

Integral thickness 2mm-4mm

Usually the service life is 5-10 years.

 

Construction profile

Colored sand anti-skid aggregate

Coloured green-way anti-skid paint

Asphalt or cement base

 

Construction technology

Process name

Specific practices and requirements

Site enclosure

Separation of construction area and isolation of   construction area with reflective cone to avoid traffic accidents

Foundation treatment

Clean up the dust and stains on the surface of   cement and asphalt. Clean them with detergent or clean water. Then dry the   surface. If the foundation is uneven, it needs to be repaired and leveled   with mortar.

Paving Colored Green-way Anti-skid Paint

Mix the main paint and curing agent with color   green road anti-skid paint in the proportion of 3:1 and mix evenly in a mixer   (stirring time > 2 minutes). When the mixed material is poured into the   construction area, the spreading thickness depends on the condition, but at   least at 3.35 kg /, the mixed adhesive is spread evenly with a rake to make it smooth.

Paving colored sand anti-skid aggregate

After the paving process of color green road   anti-skid paint is completed, the color sand anti-skid aggregate is spread on   the surface, and pay attention to the uniformity of the paving.

Recovery of colored sand anti-skid aggregate

After the laying layer reaches a good hardness   (about 3 hours), the floating sand can be recovered.

 

20181009121217502 (1).jpg

法律聲明

法律聲明法律聲明法律聲明法律聲明法律聲明法律聲明法律聲明
x

隐私保護

隐私保護隐私保護隐私保護隐私保護隐私保護隐私保護隐私保護
x
x